Volkswagen Body Shop and Battery Plant Expansion
Provided design and construction of electrical systems for a new Battery assembly facility and Body shop expansion including (2) 1200A 12,470V services with main tie main switchgear configuration, (12) 2500KVA Unit substations, power Monitoring system, Approximately 2500 linear feet of 2500A 480V Bus Duct, All exterior and interior LED lighting, and fire alarm system.