Graves Gilbert Clinic

Provide construction for a new medical care facility including (1) 2500A 277/480V service, (1) 500KVA dry type transformer, (1) 2000A 120/208V switchboard, (1) 100KW natural gas generator, all interior and exterior lighting, all critical branch/life safety circuitry, and fire alarm system.

Americold

Provide design build plan for a new cold storage facility in Atlanta GA. Install (2) 4000 amp switchgears, (2) generator tap boxes, access controls, fire alarm system, lightning protection for facility, and all exterior and interior LED lighting with low voltage lighting controls. Also provide power and communications to rooftop mounted RU units for the […]

Woodford Reserve III

Provided construction of electrical systems for a new barrel storage site with (2) 90,000 SF barrel warehouses and (1) 7,600 SF barrel transfer building. Electrical installation consisted of (1) New 600A 12,470V service and exterior switchgear, (3) 300KVA pad mount transformers, all interior Class 1 Div 2 lighting, all exterior lighting, Lightning protection system, fire […]

More than a Bakery

Provided design and construction of electrical systems for a new Bakery including (2) 4000A 277/480V services, (1) 100KW diesel generator, all exterior and interior LED lighting, power and controls for process equipment, fire alarm system, and structured cabling system.

Grainger

 Provided design and construction of electrical systems for a new greenfield distribution center including (1) 600A 12,470V switchgear, (2) 2500KVA pad mount transformers, (2) 2500 KW Diesel generators, (2) 4000A automatic transfer switches, (1) main tie main 4000A 277/480V services, (1) 1200KVA fly wheel uninterruptible power system, power monitoring systems, all exterior and interior lighting, […]

STL

Installed cable tray and conduit to provide power and controls to equipment. Terminated valves, proximity switches, solenoids, limit switches, and control panels. Assisted during start – up and commissioning to provide updated red line drawings for the customer. Also provided power and controls to customers induction heater that included a water-cooled bus bar.

Volkswagen Body Shop and Battery Plant Expansion

Provided design and construction of electrical systems for a new Battery assembly facility and Body shop expansion including (2) 1200A 12,470V services with main tie main switchgear configuration, (12) 2500KVA Unit substations, power Monitoring system, Approximately 2500 linear feet of 2500A 480V Bus Duct, All exterior and interior LED lighting, and fire alarm system. 

Nokian Tyre

Provided design and construction of all electrical systems for a new greenfield tire manufacturing facility including (2) 1200A 12,470V services, (9) 2500KVA Unit substations, power Monitoring system, (1) 100KW diesel generator, (2) 60KW diesel generators, All exterior and interior LED lighting, fire alarm system, structured cabling system, CCTV system, Access control system, and paging system. […]

Academy Sports Distribution, TN

1,740,000 SF Distribution Facility. This Facility was a Design/Build consisting of (2) 3000A, 480/277V services, and 480V plant distribution and feeders. Fluorescent lighting, Emergency Generator Power, Fire Alarm, 480V Power Distribution for conveyor control cabinets, Large Office Area, and a full operable Kitchen. The facilities design also included (240) docks, remote Fire Pump Building with […]

Academy Sports, GA

Provided power distribution from existing switchboards for new power distribution panels, lighting panels and receptacle panels located in the expansion area. Extended existing life safety power to the expansion. Provided power and lighting for multiple multi-level pick modules located in the existing building and in the expansion. Added new computer room with UPS and normal […]