Project Details

Location

Houston, TX

Square Feet

120,000 SF

Duration

1 Year

STL

Installed cable tray and conduit to provide power and controls to equipment. Terminated valves, proximity switches, solenoids, limit switches, and control panels. Assisted during start – up and commissioning to provide updated red line drawings for the customer. Also provided power and controls to customers induction heater that included a water-cooled bus bar.

Contact Us