Project Details

Location

Dayton, TN

Square Feet

830,000 SF

Duration

2 Years

Nokian Tyre

Provided design and construction of all electrical systems for a new greenfield tire manufacturing facility including (2) 1200A 12,470V services, (9) 2500KVA Unit substations, power

Monitoring system, (1) 100KW diesel generator, (2) 60KW diesel generators, All exterior and interior LED lighting, fire alarm system, structured cabling system, CCTV system, Access control system, and paging system. M&L also provided the electrical installation for (3) Mixing lines and other tire making equipment.

Contact Us