Project Details

Location

Louisville, KY

Square Feet

1,500,000 SF

Duration

18 Months

Grainger

 Provided design and construction of electrical systems for a new greenfield distribution center including (1) 600A 12,470V switchgear, (2) 2500KVA pad mount transformers, (2) 2500 KW Diesel generators, (2) 4000A automatic transfer switches, (1) main tie main 4000A 277/480V services, (1) 1200KVA fly wheel uninterruptible power system, power monitoring systems, all exterior and interior lighting, low voltage lighting control system, power for all mechanizations and fire alarm system.